Case study · Complex wastewater
Treatment of complex industrial wastewater.
A 200 m³/day plant built in 2026, with pretreatment, 4-stage biological oxidation, two MBR lines and nanofiltration. The process includes excess sludge dewatering.

The plant solution
From pretreatments to nanofiltration.
The line includes two initial fine-screening stages, oil removal, grit removal and storage, followed by 4-stage biological oxidation, two MBR lines and nanofiltration.
01
Double fine screening
Initial pretreatment
02
Oil removal
03
Grit removal
04
Accumulation
05
Biological Oxidation
In 4 stages
06
Two MBR lines
07
Nanofiltration
Sludge line: excess sludge dewatering.
A process for your project
Do you need to treat complex industrial wastewater?
Share available flow rates, analyses and treatment objectives with Sereco technicians.